Massachusetts hospital needs a year to repair flooding damage, Steward says

The health centers owner, Dallas-based Steward Health Care, stated the center was checked by designers, engineers, electrical contractors and other specialists who assisted figure out a timeline for repair work..

Steward told Beckers that the assessment revealed “all of the mechanical devices at Norwood Hospital is unfit for client care,” which a “overall replacement is required.”.

© Copyright ASC COMMUNICATIONS 2020. Intrigued in LINKING to or REPRINTING this content? View our policies by click on this link.

The hospital revealed plans to temporarily close June 29 and is still closed..

More posts on capital jobs: Pandemic hold-ups building of Cleveland Clinic hospital in Mentor15 medical facility structure projects costing $1B or more5 healthcare facilities buying land for expansions.

As a result, it will take a minimum of 12 months to restore key infrastructure and revive services..

Alia Paavola –
Wednesday, October 21st, 2020
Print|Email.

Health center authorities stated the repairs will focus initially on the medical facilitys emergency department.

About 150 clients were left from the medical facility June 28 after water rose quickly in the parking area and reached as high as 4 feet in the medical facilitys basement, knocking out the electricity..

Norwood (Mass.) Hospital will require a minimum of a year to repair damage sustained from a flood this summer, the medical facilitys owner confirmed to Beckers Hospital Review.